Roadmap

  • Milestone: 0.3.6

    Due in 4 weeks (01/31/09)

    8%

    Closed tickets:
    1
    Active tickets:
    12

    Minor updates, as well as improved installer handling.

  • Milestone: 0.4.0

    Due in 4 months (05/01/09)

    27%

    Closed tickets:
    21
    Active tickets:
    57
    • Improved LUA module
    • pre-configured "useful" checks (ie. a lot of check_cpu, check_eventlog etc. etc.)
    • built-in clients for check_nt (and check_nrpe)
    • Improved installer
    • Unicode settings handler
    • Configuration interface
  • Milestone: 0.5.0

    No date set

    0%

    Closed tickets:
    0
    Active tickets:
    5

    ??? (all that was here has been moved over to to 0.4.0 :)